Choose the backed-up loads
List the essential circuits and major starting loads you want available. Ask the contractor to explain the operating limits of the proposed system.
Coordinate the installation
Include equipment placement, electrical connection, fuel work where applicable and related site work. Identify any other trade or permitting responsibility in writing.
Set the handover expectations
Ask for operating instructions, testing, maintenance responsibilities and warranty details. Availability and installation dates are confirmed with the chosen contractor.
Get an estimate