Align electrical work with the renovation
If a project changes a kitchen, heating system or living space, bring the equipment list and drawings. Identify whether the meter or panel would move and ask which approvals apply to that particular alteration. Confirm any property-specific approvals with the City before the work is scheduled.
Compare the complete work around the panel
Ask about access to the panel, reconnection of existing circuits, grounding and bonding work, and restoration of openings. If the home will lose power during the job, agree what needs to happen before service can be restored.
Your address-qualified next step
Provide the full jobsite address and confirm the electric utility from the account. Use current L&I jurisdiction guidance for electrical permits, and check incorporated City versus unincorporated County status separately for any building or land-use work. Ask the contractor who obtains permits, schedules inspection and coordinates utility equipment changes.
Get an estimate